Asphalt mixing plant construction involves a large-scale (removable) asphalt mixing plant. Let's take a look at some construction techniques for this large-scale (removable) road machinery asphalt mixing plant!

Before construction begins, the top surface of the asphalt mixing plant should be cleaned of any fill and kept dry and leveled to the design height. If the ground is too soft, the foundation should be reinforced to prevent instability and ensure the verticality of the pile frame.
Next, the incoming construction machinery should be inspected to ensure it is in good condition. Assembly and commissioning should be conducted only if it meets the requirements. The verticality of the asphalt mixing plant must be maintained, with the gantry guide and mixing shaft not exceeding 1.0% verticality to the ground.
When setting out the asphalt mixing plant, follow the pile layout diagram, with a maximum error of 2 cm. The asphalt mixer should be equipped with a 110KVA construction power supply and 25mm ? water pipes to ensure stable power supply and various conveying systems. When the asphalt mixing plant is positioned and ready, the motor of the asphalt mixing plant can be turned on, and the wet spraying method can be used to pre-mix the cut soil to make it sink; after the mixing shaft sinks to the designed depth, the drill can be lifted and sprayed at a speed of 0.45-0.8m/min.