What regulations must be followed during the construction of an asphalt mixing plant?
Construction of an asphalt mixing plant should be carried out according to regulations to ensure both construction quality and the protection of the asphalt mixing equipment. While key aspects of the project are crucial, the key construction methods for asphalt mixing plant projects must also be applied flexibly.

First, before construction begins, the collapsible loess on top of the walls must be removed and kept dry. The site must be leveled to the design elevation specified in the design plan. If the soil layer is too soft, structural reinforcement of the roadbed should be used to prevent imbalance of machinery during construction and ensure the uprightness of the pile frame.
Second, the construction machinery and equipment arriving at the plant must be inspected to ensure they are in good working order. Assembly and trial runs should be conducted, ensuring the asphalt mixing plant is level, directional, and that the error in the mixing shaft's alignment with the road surface does not exceed 1.0%.
Finally, the layout of the asphalt mixing plant construction should be carried out according to the actual operation of the pile location plan, with deviations not exceeding 2 cm. This utility model uses a Φ25mm water tap to install the asphalt mixing device and is equipped with a 110KVA construction power supply to ensure the normal and stable operation of its power supply and all transportation management methods.
After the asphalt mixing plant is precisely positioned, the mixing plant motor can be turned on, and the soil can be pre-mixed and lowered using the wet spraying method; only after the mixing shaft has moved to the designed position can the soil being lifted and lowered at a speed of 0.45~0.8 m/min be started.
Our company's main products: asphalt mixing equipment, asphalt mixers, asphalt mixing plants, asphalt mixture mixing equipment, and heat transfer oil heated asphalt equipment.