If you have never done civil engineering, it may be difficult to understand why we need to set up an additional asphalt mixing station. The asphalt mixing station mentioned here is actually also called asphalt concrete mixing station or asphalt concrete mixing station. If you want to know why you need to set up an additional point as an asphalt mixing station, then you might as well understand these points.

1. Higher production efficiency
One effect of centralized mixing is to improve productivity, so that productivity can be effectively controlled and higher productivity. And generally, centralized mixing uses machinery and equipment to mix, so productivity is effectively controlled.
2. Reduce pollution
During the mixing process of asphalt, some gas or waste residue will be produced, which is a kind of pollution to the ecological environment. The purpose of centralized mixing is to reduce pollution to the natural environment.
3. Strictly control the proportion
The asphalt used in different places has strict distinctions in the proportion requirements. Centralized mixing can control the proportion more accurately according to the data, so that the asphalt mixed can meet the requirements of on-site use.
From the above three points, it is not difficult to see why an asphalt mixing plant must be set up, and under normal circumstances, the mixing plant will be a certain distance from the work site, and will be mainly located in remote and distant suburbs, rather than in cities and densely populated areas. In fact, there will be a certain odor during the mixing process, so for densely populated areas, it is generally not suitable to set up a mixing plant.