Home » Products » Bitumen Processing » How does the modified asphalt equipment work? How is it heated?

How does the modified asphalt equipment work? How is it heated?

The modified asphalt equipment estimates the quality and uniformity of various raw materials from the material pile and conveyor at any time. The modified asphalt equipment checks the soil and oversized gravel, and checks whether there is any leakage in the cold hopper. Estimate whether the mixed material is mixed evenly, whether there is white material, whether the oil-stone ratio is reasonable, and check the concrete segregation of the asphalt mixture and the mixed material.
The modified asphalt equipment checks the control parameters of various basic parameters of the mixing device in the control room, the display values ??of the control screen, and the modified asphalt equipment checks whether the data statistics and display values ??of the computer and printout are consistent. Test the raw material heating temperature and the mixed material entry temperature of the modified asphalt equipment.

Rated 4.7/5 based on 521 customer reviews
Share:
Content

The modified asphalt equipment estimates the quality and uniformity of various raw materials from the material pile and conveyor at any time. The modified asphalt equipment checks the soil and oversized gravel, and checks whether there is any leakage in the cold hopper. Estimate whether the mixed material is mixed evenly, whether there is white material, whether the oil-stone ratio is reasonable, and check the concrete segregation of the asphalt mixture and the mixed material.
The modified asphalt equipment checks the control parameters of various basic parameters of the mixing device in the control room, the display values ??of the control screen, and the modified asphalt equipment checks whether the data statistics and display values ??of the computer and printout are consistent. Test the raw material heating temperature and the mixed material entry temperature of the modified asphalt equipment.
The staff of the modified asphalt equipment should cooperate with the staff of the laboratory, and adjust the mixing plant immediately according to the situation reflected by the laboratory test results, so that the mixed material ratio, temperature, and oil-stone ratio are within the required enterprise range. In the production and processing of modified asphalt equipment, the temperature of the modified asphalt equipment should meet the construction temperature requirements of hot-mixed cement concrete. The residual moisture content of the asphalt mixture blown dry by the modified asphalt equipment shall not exceed 1%. At the beginning of each day, the heating temperature should be raised for the first few batches of asphalt mixture, and the modified asphalt equipment and cold mix several pots of asphalt mixture waste should be added before the mixture is mixed with asphalt.
The mixing time of the modified asphalt equipment should be determined by trial mixing according to the actual situation, and the asphalt should be evenly coated with the asphalt mixture. The processing cycle of each batch of the modified asphalt equipment rotary mixer should not be less than 45s (the cold mixing time should be no less than 5~10s).
If there is water in the asphalt of the modified asphalt equipment, we need to open the external floating roof when the temperature is 100 degrees, and then open the asphalt tank, it will circulate to dry. During operation, we should pay special attention to the water level in the asphalt tank and make adjustments immediately. When the asphalt level gauge of the asphalt tank of the modified asphalt equipment centrifugal fan is lower than the position of the temperature gauge, we should turn off the asphalt pump to prevent the asphalt in the electric heater from flowing out. Before ignition, we need to fill the water tank with water. After the modified asphalt equipment and other mechanical equipment are fully prepared, we can see whether the connected area is firm.
If the modified asphalt equipment is put into the asphalt for the first time, we also need to open the automatic vent valve of the asphalt heating tank, and then let the asphalt enter the electric heating device. After we remove the water, we also need to observe the temperature change. If the temperature is too high and does not need to be released, we should immediately start the circulation cooling. Because the modified asphalt equipment needs to save dyes and ensure the efficiency of the modified asphalt equipment, it is necessary to add coal as little as possible, and the ash must be removed immediately.

Inquiry


    More Road Maintenance

    From the current point of view, road construction machinery has bottomed out and asphalt meltering equipment has risen rapidly. In recent years, highway construction and maintenance departments have a strong awareness of using asphalt mixing equipment, especially in developed coastal areas such as Beijing, Shanghai, Jiangsu, Zhejiang, etc. In addition, these regions have a fast economic growth rate, relatively developed industry, and strong comprehensive economic strength. Therefore, the consumption of asphalt mixing equipments in these regions has always been at the forefront of the country. With the rapid development of highway construction and the increase in demand for asphalt, barreled asphalt has been widely used for its convenient transportation and easy storage. In particular, most of the high-performance imported asphalt used in high-grade highways is in barrel form, which requires an asphalt meltering equipment with fast melting speed, clean de-barreling, and can prevent asphalt aging. my country’s highway construction has achieved remarkable results, among which mechanized production has contributed greatly. Different types of asphalt mixers and bitumen meltering equipment are selected for the characteristics of large highway pavement construction and tight construction period. With the rapid development of my country’s economy, the further extension of expressways, and the large-scale development of western construction, the central and western regions have become new investment hotspots. While paying attention to the market in the developed eastern regions, domestic road construction machinery manufacturers have also increased their efforts to develop the central and western markets, creating new highlights for the domestic asphalt mixing plants consumer market. In summary, my country’s asphalt mixing plant sales market has begun to move westward with the westward movement of investment hotspots. As the market center of gravity gradually shifts westward, the market in the western region is gradually heating up. The self-heating integrated structure, hot air barrel melting and bitumen barrel flipping technology in the asphalt barrel removal equipment are our company’s self-heating integrated structure. The thermal oil furnace used in the old equipment is perfectly integrated with the asphalt barrel removal equipment body, which reduces the volume of the entire set of equipment, greatly reduces equipment investment, saves equipment space and transfer transportation costs.

    Emulsified modified asphalt equipment is classified according to the production process and can be divided into three types: intermittent emulsified modified asphalt equipment, semi-continuous emulsified modified asphalt equipment, and continuous emulsified modified asphalt equipment. During the production of emulsified modified asphalt equipment, demulsifier, acid, water, and latex modified materials are blended in a soap mixing tank, and then pumped into the asphalt into the colloid mill. After a can of soap is used up, the soap is redispensed, and then the production of the next can is completed.
    The emulsified modified asphalt equipment mentioned here includes hot water pumps and circulation pumps. This type of centrifugal water pump generally uses a pipeline centrifugal pump. There is a sewage outlet at the bottom of the pipeline centrifugal pump. Pay attention to the sewage outlet at the bottom of the emulsified modified asphalt equipment pump. The water in the water tank is released through the filter valve. Some emulsified modified asphalt equipment does not have a filter valve to save equipment costs, so it can only be emptied by loosening the flange bolts at the bottom. There are basically two methods of moisturizing emulsion pumps for emulsified modified asphalt equipment on the market, gear oil pumps or centrifugal water pumps. The gear oil pump can only drain the liquid in the pump through the connecting flange of the pipeline. The centrifugal water pump carries out sewage treatment through its own sewage outlet.
    When used in the production of emulsified modified asphalt equipment, depending on the modified material technology, the latex pipeline can be connected in front of the colloid mill or behind the colloid mill, or there may be no latex pipeline and it must be made manually. Add the required amount of latex into the soap jar.

    In modern highway maintenance work, how to repair asphalt pavement quickly and effectively has become one of the key issues. As an advanced repair technology, cold patching technology is very popular because of its convenient construction and remarkable effects.
    What is the cold patching process?
    Cold patching process, as the name suggests, refers to a technical method for repairing asphalt pavement without heating. This process uses a specially proportioned cold-patch asphalt mixture. This material can maintain good fluidity and adhesion even at lower temperatures, thus ensuring the quality of the repair.
    Advantages of cold patching process
    Fast construction: Cold patching materials can be directly applied to damaged areas without preheating, and are immediately open to traffic, greatly shortening repair time.
    All-weather construction: Whether in hot summer or cold winter, cold patching materials can be effectively constructed and are not affected by the weather.
    Easy to operate: Thanks to its good working properties, even small damaged areas can be repaired easily.
    Environmentally friendly: The construction process reduces environmental pollution and is in line with the concept of green construction.
    Application scenarios
    The cold patching process is suitable for various types of pavement repair work, especially those places where traffic needs to be restored quickly, such as urban main roads, highway ramps, etc. In addition, the cold patching process is also an ideal choice for remote areas or situations where professional heating equipment is lacking.
    In short, the cold patching process has occupied a place in the field of rapid repair of asphalt pavement with its unique advantages and has become an indispensable part of modern highway maintenance.