Installation, use and management methods of large asphalt mixing plants

At present, the assembly and installation technology of large-scale asphalt concrete mixing equipment in high-grade highway construction is gradually improving. In order to improve work efficiency, it is necessary to analyze the pretreatment agent for the selection and matching of large-scale mixing equipment and auxiliary equipment, and clarify the installation and commissioning of asphalt stations. With the continuous change of highway construction methods, it is necessary to adopt production equipment according to the requirements of the development of the times. Intermittent asphalt mixing equipment is a widely used road construction equipment with the characteristics of simple operation and high work efficiency. Relevant staff are required to master the installation, construction and management methods of mixing equipment.

Rated 5/5 based on 599 customer reviews
Share:
Content

At present, the assembly and installation technology of large-scale asphalt concrete mixing equipment in high-grade highway construction is gradually improving. In order to improve work efficiency, it is necessary to analyze the pretreatment agent for the selection and matching of large-scale mixing equipment and auxiliary equipment, and clarify the installation and commissioning of asphalt stations. With the continuous change of highway construction methods, it is necessary to adopt production equipment according to the requirements of the development of the times. Intermittent asphalt mixing equipment is a widely used road construction equipment with the characteristics of simple operation and high work efficiency. Relevant staff are required to master the installation, construction and management methods of mixing equipment.

[1]. Installation of large-scale asphalt mixing station
At present, large-scale asphalt mixing equipment should pay attention to site selection and application technology, master the installation methods of foundation and equipment, and the following will analyze the installation of large-scale asphalt mixing stations in detail.
1. Foundation and equipment installation
In addition to considering many factors in site selection, asphalt mixing plants must be located away from residential areas and farmland. Before installation, the equipment must be debugged to confirm whether there are scratches and wear, and lubricate the bearings according to the established conditions. Secondly, the technicians must confirm the normal operation of the equipment and electrical system during the inspection. If there are abnormal conditions, they must be checked in time to eliminate safety hazards. Since the mixing station involves many materials, all surrounding resources must be considered. The asphalt mixing station should be reasonably selected according to the geological conditions. It is mainly divided into two types: field and soft foundation. Since the field soil is relatively hard, the bottom layer should be properly established and paved after digging. Secondly, the foundation concrete construction procedure should be considered, and the filling degree after excavation should be analyzed. After the soft foundation is laid out and excavated, different technical processes can be selected to reinforce the bottom of the foundation, generally in the form of plum blossom piles and vibration protection tubes.
In order to prevent the foundation area at the bottom from gradually increasing and reach the bearing capacity of the foundation, it is necessary to analyze the potential dangers of cracking and sinking equipment in practice. During the foundation construction process, attention should be paid to the foundation pouring of the main building part and the aggregate drying part. During the foundation installation process, it is necessary to ensure that the same horizontal plane does not exceed the standard height, thereby reducing the harm of resonance. Through an effective installation procedure, the main building is established as the center and the installation is radiated to three sides. While large equipment occupies land, the basic tasks of large cranes must be completed in a short time, thereby achieving the purpose of cost saving.
2. Cable installation
In recent years, with the continuous increase in the number of mixing stations, the power consumption of the entire motor has also increased, and the general power is about 500-1000kw. Due to the large cross-sectional area of ??the power supply line, in the process of controlling the original parts, it is necessary to use cable troughs and dark trenches to arrange them reasonably. During the arrangement process, the cable table should be carefully checked. In order to avoid the phenomenon of circuit breaker, self-adhesive high-pressure tape should be selected for effective connection.
In the process of controlling the system circuit, the signal must be shielded first and arranged according to the established requirements. In order to reduce the impact of external electromagnetic interference on the system, the line needs to be concealed and protected, and safety protection warnings should be made. The circuit direction should try to choose oil circuits and high-temperature areas. If the coordinates are unclear in practice, it should be put aside first, and the line should be inspected and analyzed in detail during the debugging process. In order to make up for the omissions, it should be improved one by one to avoid line damage.

[2]. How to effectively manage large asphalt mixing plants
In view of the problems that need to be paid attention to during the installation of large asphalt mixing plants, in order to manage them in a refined manner, it is necessary to start from multiple aspects and master multiple management methods to improve the overall management effect. The following will conduct a detailed analysis of the effective management of large asphalt mixing plants.
1. Strengthen the management of production personnel
In the daily management of asphalt mixing plants, production personnel occupy an important position. Since the actual management involves the main building, storage, material supply and asphalt supply, etc., it is necessary to conduct a detailed analysis of the auxiliary components. In addition to the conventional application system, if the setting and effective management of other systems are ignored, the mixing station will be paralyzed, and then the system will be damaged. In order to ensure the further development of the mixing station, professional management personnel should be arranged to manage it, so as to promote the normal operation of the mixing station. First of all, the relevant leadership organizations should clarify their own responsibilities, analyze the overall mixing station information resources, do a good job in the relevant work of automatic operation, and practice according to the established procedures. Secondly, the operators must understand the basic operating principles, master the electric welding skills, and be proficient in the application and operation procedures of the mixing equipment. Other supporting personnel must be familiar with the management and operation content, clarify the basic work flow of the mixing station, and have a strong sense of responsibility and enthusiasm in practice.
2. Strengthen the management of production technology
Due to the differences between the operating system of large asphalt mixing plants and the original small operating system, most of them are controlled by the working server as the terminal, and must be operated according to strict operating instructions. However, in actual management, there are cases of improper operation that affect the effectiveness of operation. Therefore, the team members need to conduct detailed inspections on each operating procedure, including: the lubrication of each bearing, whether the switch handle is correct, whether the heating of the asphalt pump meets the requirements, and whether the parameters of each system are within the allowable range. After the inspection, it can be started. Since road construction involves many influencing factors, in order to reduce capital investment, it is necessary to preheat the machine in advance. After the relevant operating procedures are completed, other fuels can be used for combustion. Since heavy oil uses other fuels for combustion, in order to obtain better fluidity, the oil point should be heated to 100℃~120℃. If it is a cold machine, it must be preheated for at least 15 minutes, and when the basic temperature drops to 80℃~90℃, moisture can be evaporated. During the operation, it is necessary to strictly follow the procedures for preparation. The server and industrial computer can be connected online, and the actual situation of the server and the online connection can be observed to prepare for the use of the instrument.
3. Cost management
Large-scale asphalt mixing plants require a large amount of capital during the installation process. If the capital investment in each link is not properly controlled, it is easy to cause waste. Therefore, cost management should be done well in the overall management. Since the processing cost of asphalt mixture is relatively expensive, 1t is about 400 to 500 yuan. If it is wasted for a long time, it will directly cause economic losses. In the process of cost control, the loss of mixture must be controlled first. Professional supervisors must review the quality and quantity of materials in a timely manner. In order to avoid serious waste, aggregates must be effectively controlled. In addition, the fuel system must be transformed and optimized. Practice has proved that a fully functional burner needs to heat the aggregate to 180°C, which is greater than the required diesel 8L. According to the current oil price standard, it will consume about 40 to 50 yuan. If heavy oil is used, the cost can be reduced. Therefore, under the premise of ensuring the stable operation of the equipment, the fuel type must be reasonably selected to improve the overall economic benefits.
4. Related data management
Since a large asphalt mixing plant is a set of complete operating equipment, each component has specified technical standards and application parameters. In the process of equipment maintenance and care, it is necessary to collect and manage relevant data and important components. In order to avoid material loss or other situations, the data should be backed up. In addition, the daily production and maintenance of the machine should be registered and managed, and various types of data should be classified and managed for easy reference and processing in the future. In data management, relevant staff should master computer management technology. There are many types of aggregates involved in the asphalt mixing process. The amount and function of each type of data are different. In order to manage the data reasonably, it is necessary to use information technology as a management platform to manage the data technically to avoid information loss.

[3]. Conclusion
Since the installation and application of large asphalt mixing plants involve many influencing factors, they should be taken seriously in practice. In order to avoid serious improper installation or other technical problems, a detailed analysis of the management method is required. In combination with the actual situation, the relevant staff should do their own work well and determine their own responsibilities according to the practice content. In order to ensure the effectiveness of management, it is necessary to start from the management of production personnel, production technology, cost management, and related data management, and conduct a detailed analysis of the influencing factors, so as to achieve the purpose of enhancing management effectiveness.

Inquiry


    More Asphalt Processing

    Now on the construction site, including in some engineering construction, one of the equipment used is asphalt mixing plant. It can be said that it can be used in many ranges and fields, and it can provide certain help for my country’s infrastructure construction. Of course, in the process of use, it is necessary to do a good job in many aspects, so that the use of mixing plant can be safer and more worry-free.
    1. Maintain standardized operating procedures
    In fact, it is not only in the use of asphalt mixing plant, but also in the use of other equipment. It should be done well. It can be said that this mixing plant will also have certain dangers. If there is any carelessness, it may also cause great losses. Therefore, at this time, it is still necessary to pay attention to the correct specifications and follow the process step by step. Only in this way can it be used safely and other use problems can be effectively avoided.
    2. Adjust the reasonable mixing ratio
    In the application of asphalt mixing plant, the most important and core step is the mixing. The mixing ratio of raw materials should be within a reasonable range and completed according to actual needs. Do not add or reduce raw materials at will according to your own wishes. Such operation is not standardized. In addition, after making a good ratio, you should also pay attention to safety protection measures during operation.
    Asphalt mixing plant still plays an important role. If you want to make the use of the mixing plant safer and more worry-free, you should pay more attention when using it and have a certain understanding of these precautions. Only in this way can you ensure that there will be no other problems in use and ensure the safety of the mixing plant.

    I. The basis for the classification of asphalt mixing plant models
    The models of imported asphalt mixing plants are mainly divided according to the following three aspects:
    1. Production capacity: According to the size of production capacity, asphalt mixing plants can be divided into small (30-60 tons/hour), medium (60-300 tons/hour) and large (300 tons/hour or more).
    2. Functional characteristics: Different models of asphalt mixing plants have different functional configurations, such as asphalt batching system, interference screening system, thermal regeneration system and asphalt storage system, etc., to meet the needs of different road construction projects.
    3. Additional equipment: According to customer requirements, imported asphalt mixing plants can also be equipped with additional equipment such as environmental protection equipment, intelligent control systems, oil storage tanks, etc., which will also affect the classification of models.
    II. The difference and application scope of different models of asphalt mixing plants
    1. Small asphalt mixing plant: suitable for smaller-scale road construction projects, such as community or village roads. Although the production efficiency is low, it occupies a small area and is affordable.
    2. Medium-sized asphalt mixing plant: suitable for medium-sized road construction, such as county and township roads. Its production efficiency is high, it has certain requirements for the quality of raw materials, and the price is moderate.
    3. Large asphalt mixing plant: suitable for large-scale construction projects such as highways and airports. The production efficiency is extremely high, and the requirements for asphalt materials are also higher, but it occupies a large area and has a high price.
    In summary, the selection of a suitable imported asphalt mixing plant model requires comprehensive consideration of factors such as production capacity, functional characteristics and additional equipment, and selection and purchase according to the needs of the actual road construction project.

    The asphalt mixing equipment mentioned here may also refer to an asphalt concrete mixing station. At present, asphalt mixing equipment generally uses a complete set of equipment for mixing. So what are the benefits of using a complete set of equipment?
    1. More effective.
    In today’s industrial production, a complete set of asphalt mixing equipment can help improve production efficiency and ensure product quality. This is why even in a mixing station, the equipment used is a complete set of equipment.
    2. Ensure quality.
    When mixing asphalt, a certain ratio is set. For this type of asphalt liquid used in different occasions, its ratio control has strict requirements. It is necessary to determine its mixing method and mixing time to ensure that the asphalt liquid is consistent with the production site. One of the advantages of a mixing station is that the quality can be effectively controlled.
    3. It can be sampled.
    After mixing at the mixing station, the quality inspector can sample and inspect to ensure that the mixed asphalt liquid meets the use requirements.
    In short, asphalt mixing equipment will use a complete set of equipment, mainly to facilitate the later asphalt to meet production needs. Through the mixing station, the mixing time and feeding sequence can be better controlled, so that the mixed product can meet different use requirements. And after using the archiving equipment, effective spot checks can be carried out, which can better ensure that the quality meets the construction requirements.

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.

    With increasingly stringent environmental protection policies, asphalt mixing stations face severe challenges such as excessive dust and exhaust gas emissions. How to achieve standard production through efficient and environmentally friendly transformation while controlling costs? This article will reveal three core transformation plans to help mixing stations achieve a direct reduction of more than 80% in emissions, combining economy and compliance!
    1. Dust control: Upgrade pulse bag dust removal system
    Traditional dust removal equipment is difficult to cope with high humidity and high viscosity dust in asphalt stations, which can easily cause filter bags to compact. The transformation plan includes:
    Filter material upgrade: Use oil-proof and waterproof coated filter bags, which can withstand 240℃ high-temperature asphalt flue gas and extend the service life by 2 times.
    Intelligent cleaning: Equipped with a 0.5MPa high-pressure pulse backflush device, the cleaning frequency is automatically adjusted according to the pressure difference, and the dust capture efficiency exceeds 99%.
    Seal transformation: Install double-layer soft curtain seals on dust-raising points such as silos and conveyor belts to reduce unorganized emissions.
    Transformation effect: dust emission concentration dropped from 100mg/m3 to below 10mg/m3, which is better than the national standard.
    With increasingly stringent environmental protection policies, asphalt mixing plants face severe challenges such as excessive dust and exhaust gas emissions. How to achieve standard production through efficient and environmentally friendly transformation while controlling costs? This article will reveal three core transformation solutions to help mixing stations achieve a direct reduction of more than 80% in emissions, combining economy and compliance!