Before use, please check whether the position of each valve is accurate and make preparations before work. After starting the motor of the asphalt spreading truck, check the four heat transfer oil valves and air pressure gauge. After everything is normal, start the engine and the power take-off starts to work. Try running the asphalt pump and cycle for 5 minutes. If the pump head shell is hot to your hands, slowly close the thermal oil pump valve. If the heating is insufficient, the pump will not rotate or make noise. You need to open the valve and continue to heat the asphalt pump until it can operate normally.

Rated 4.6/5 based on 273 customer reviews
Share:
Content

Before use, please check whether the position of each valve is accurate and make preparations before work. After starting the motor of the asphalt spreading truck, check the four heat transfer oil valves and air pressure gauge. After everything is normal, start the engine and the power take-off starts to work. Try running the asphalt pump and cycle for 5 minutes. If the pump head shell is hot to your hands, slowly close the thermal oil pump valve. If the heating is insufficient, the pump will not rotate or make noise. You need to open the valve and continue to heat the asphalt pump until it can operate normally.
During the working process, the asphalt liquid must maintain a working temperature of 160~180°C, and cannot be filled too full (pay attention to the liquid level pointer during the injection of asphalt liquid, and check the tank mouth at any time). After the asphalt liquid is injected, the filling port must be closed tightly to prevent the asphalt liquid from overflowing during transportation. During use, the asphalt may not be pumped in. In this case, you need to check whether the interface of the asphalt suction pipe is leaking. When asphalt pumps and pipes are blocked by solidified asphalt, use a blowtorch to bake them, but do not force the pump to turn. When baking, care should be taken to avoid directly baking ball valves and rubber parts. The car keeps driving at a low speed while the asphalt is sprayed. Do not step on the accelerator hard, otherwise it may cause damage to the clutch, asphalt pump and other components. If you are spreading 6m wide asphalt, you should always pay attention to the obstacles on both sides to prevent collision with the spreading pipe. At the same time, the asphalt should remain in a large circulation state until the spreading work is completed. After every day’s work, any remaining asphalt must be returned to the asphalt pool, otherwise it will solidify in the tank and will not work next time.

Inquiry


    More Road Maintenance

    From the current point of view, road construction machinery has bottomed out and asphalt meltering equipment has risen rapidly. In recent years, highway construction and maintenance departments have a strong awareness of using asphalt mixing equipment, especially in developed coastal areas such as Beijing, Shanghai, Jiangsu, Zhejiang, etc. In addition, these regions have a fast economic growth rate, relatively developed industry, and strong comprehensive economic strength. Therefore, the consumption of asphalt mixing equipments in these regions has always been at the forefront of the country. With the rapid development of highway construction and the increase in demand for asphalt, barreled asphalt has been widely used for its convenient transportation and easy storage. In particular, most of the high-performance imported asphalt used in high-grade highways is in barrel form, which requires an asphalt meltering equipment with fast melting speed, clean de-barreling, and can prevent asphalt aging. my country’s highway construction has achieved remarkable results, among which mechanized production has contributed greatly. Different types of asphalt mixers and bitumen meltering equipment are selected for the characteristics of large highway pavement construction and tight construction period. With the rapid development of my country’s economy, the further extension of expressways, and the large-scale development of western construction, the central and western regions have become new investment hotspots. While paying attention to the market in the developed eastern regions, domestic road construction machinery manufacturers have also increased their efforts to develop the central and western markets, creating new highlights for the domestic asphalt mixing plants consumer market. In summary, my country’s asphalt mixing plant sales market has begun to move westward with the westward movement of investment hotspots. As the market center of gravity gradually shifts westward, the market in the western region is gradually heating up. The self-heating integrated structure, hot air barrel melting and bitumen barrel flipping technology in the asphalt barrel removal equipment are our company’s self-heating integrated structure. The thermal oil furnace used in the old equipment is perfectly integrated with the asphalt barrel removal equipment body, which reduces the volume of the entire set of equipment, greatly reduces equipment investment, saves equipment space and transfer transportation costs.