How to deal with the failure of the electronic control system of the asphalt mixing plant?

The core of the asphalt mixing plant is its electronic control system. If it has problems, it will cause a lot of trouble to use. However, in actual use, the electronic control system in the asphalt mixing plant will inevitably encounter some problems and failures. How to solve it at this time?
If only the instrument display of the electronic control system of the asphalt mixing plant is inaccurate, it means that the weighing system may be affected by external forces; or the drift error of the sensor causes the weighing zero position or weighing interval to change; it may also be caused by sensor damage.

Rated 4.9/5 based on 530 customer reviews
Share:
Content

The core of the asphalt mixing plant is its electronic control system. If it has problems, it will cause a lot of trouble to use. However, in actual use, the electronic control system in the asphalt mixing plant will inevitably encounter some problems and failures. How to solve it at this time?
If only the instrument display of the electronic control system of the asphalt mixing plant is inaccurate, it means that the weighing system may be affected by external forces; or the drift error of the sensor causes the weighing zero position or weighing interval to change; it may also be caused by sensor damage.
In the face of similar problems, the first thing to do is to eliminate the external force of the electronic control system of the asphalt mixing plant and recalibrate the weighing zero position. If it is a weighing of multiple sensors, it is necessary to consider the unbalanced load; if it is unbalanced, a sensor may be damaged or the cable may be loose or broken. In this case, the sensor should be replaced and the cable should be checked.
Sometimes the batching accuracy of the electronic control system of the asphalt mixing plant becomes poor, which is manifested in that during the batching process, the weighing value displayed by the batching control instrument is accurate, but the weighing value of the batching does not match the set value, and the batching accuracy exceeds the allowable range.
There are many reasons for this kind of failure, including inappropriate settings of fast and slow batching; large fluctuations in feed flow leading to large changes in overshoot; large changes in dryness and humidity of materials; too large tolerance range setting value; too short delay time for over-tolerance inspection; unreasonable settings for automatic compensation and over-tolerance inspection of instrument parameters; unreasonable settings for digital filtering and batching time parameters, etc.
It is necessary to clarify the specific causes of the failure in the asphalt mixing plant in order to solve them in a targeted manner. For example, the initial overshoot should be as close to the actual value as possible; at the same time, the batching flow should be appropriately reduced to ensure the balance of dryness and humidity of the material; and the allowable deviation value should be set not to exceed the batching accuracy range; and other parameter values ??should be set reasonably.

Inquiry


    More Asphalt Processing

    Asphalt mixing stations, also known as asphalt concrete mixing stations, can produce asphalt mixtures, modified asphalt mixtures, and colored asphalt mixtures, which fully meet the needs of building highways, grade roads, municipal roads, airports, ports, etc. Changmeng Electric Power introduces the safety operating procedures of asphalt mixing plants below:
    1. During the operation of the mixing equipment, in addition to ensuring that the equipment is in good condition, it should also be equipped with a mineral moisture content detector and a finished material tester, and the relevant data should be frequently tested for the operator to adjust the operation in time to keep the equipment in good condition.
    2. In addition to affecting production capacity, the moisture content of mineral materials is also the main factor determining fuel consumption. Additional material sheds should be added.
    3. Before operation, all working parts and devices of the mixing equipment should be fully checked to see if they are intact and normal. If there are any problems, they must be properly handled before operation, and it is forbidden to operate with illness.
    4. The operation must be carried out strictly in accordance with the procedures and precautions specified in the instruction manual. After normal ignition, the dust collector should be monitored to ensure that the drying drum burns under negative pressure; after production starts, the hot material elevator and agitator should be monitored to see if they are working normally to coordinate the operation of other parts.

    Now on the construction site, including in some engineering construction, one of the equipment used is asphalt mixing plant. It can be said that it can be used in many ranges and fields, and it can provide certain help for my country’s infrastructure construction. Of course, in the process of use, it is necessary to do a good job in many aspects, so that the use of mixing plant can be safer and more worry-free.
    1. Maintain standardized operating procedures
    In fact, it is not only in the use of asphalt mixing plant, but also in the use of other equipment. It should be done well. It can be said that this mixing plant will also have certain dangers. If there is any carelessness, it may also cause great losses. Therefore, at this time, it is still necessary to pay attention to the correct specifications and follow the process step by step. Only in this way can it be used safely and other use problems can be effectively avoided.
    2. Adjust the reasonable mixing ratio
    In the application of asphalt mixing plant, the most important and core step is the mixing. The mixing ratio of raw materials should be within a reasonable range and completed according to actual needs. Do not add or reduce raw materials at will according to your own wishes. Such operation is not standardized. In addition, after making a good ratio, you should also pay attention to safety protection measures during operation.
    Asphalt mixing plant still plays an important role. If you want to make the use of the mixing plant safer and more worry-free, you should pay more attention when using it and have a certain understanding of these precautions. Only in this way can you ensure that there will be no other problems in use and ensure the safety of the mixing plant.

    The renovation of the combustion-supporting system of the asphalt mixing plant and the use of DC frequency conversion CNC machining technology are all renovations of the original system. In addition to the above renovation plans, with the existing equipment and personnel, what other measures can be taken in the application to reduce the operating costs of concrete mixing plants?
    At present, China has no mandatory national industry standards for heavy residual oil, and the quality of fuel oil varies greatly. Even from the same dealer, the quality difference between batches is very large, and it contains more residues. Therefore, bridge inspection equipment should be installed on the construction site, and professional personnel should inspect various performance parameters of gasoline and diesel to strictly control quality.
    When the burner is working, if the flame of the combustion aid is red and the smoke from the ash removal chimney is black, this is the manifestation of poor atomization of gasoline and diesel and insufficient combustion aid. At this time, the following measures should be taken to deal with it: properly adjust the distance between the nozzle and the vortex plate, generally push it inward to a suitable distance, the purpose is to prevent the atomized oil cone sprayed from the nozzle from spraying into the vortex plate; effectively adjust the ratio of gasoline and diesel to gas, so that the gasoline and diesel increase the mass conversion law slowly, or the gas increase the mass conversion law quickly; promptly remove the carbon deposits and coke around the nozzle to prevent the flame from deflecting; heavy residual oil contains more residues, which can easily cause serious damage to the high-pressure oil pump and increase the working pressure, affecting the actual effect of atomization and the shape of the flame, so the high-pressure oil pump must be repaired or replaced in time; install metal filter devices in front of the first and second high-pressure oil pumps, and clean them frequently to prevent the residues in the gasoline and diesel from blocking the nozzle.
    The operators should be trained in professional skills on a regular basis to strengthen their job responsibilities and moral education, so that they can establish their respective job responsibilities, understand the importance of their positions, understand the content of their work, and improve their professional level. Skilled operators can properly control the temperature of the asphalt mixing plant mixture to avoid gasoline and diesel waste.
    In order to improve the combustion-supporting effect and effectively reduce the operating costs of asphalt mixing stations, Sinoroader Group kindly reminds that the following issues should be noted when using the burner in the asphalt mixing station: To improve the maintenance of the burner, the burner nozzle should be cleaned of charred materials and carbon deposits on the ignition electrode regularly. The nozzle can be disassembled according to the atomization status; the air-oil ratio of the burner is generally not adjusted, and the fuel pump pressure can be adjusted according to the smoke status and the temperature of the asphalt mixture; the sulfur dioxide generated by the combustion of light fuel oil has a strong corrosion to the bag, so the bag should be maintained regularly and the air pressure changes in the bag should be paid close attention to; water deashing will produce more foam, causing the sand settling tank to flow out, so the sand settling tank should be cleaned in time, and a watering design should be carried out to settle the foam; when the steam pressure decreases or the gear oil pump noise increases, the gear oil pump must be replaced.
    When the burner is started, the fuel oil circulation system should be completed through the valve, and then the burner control box should be opened to start the burner. If the electronic ignition of the fuel oil fails, you can change the inlet tee and use the diesel engine for ignition. After the ignition is successful for 2 minutes, you can convert it into fuel oil. In this way, even the light fuel oil of lower quality can ensure combustion.

    The actual operation steps of drying drum of asphalt mixing equipment: 1. Pay attention to routine inspection; 2. Proper operation steps; 3. Effective maintenance.
    Drying drum is a cylindrical device specially used for heating and drying stones in asphalt mixing equipment. Proper application and maintenance of drying drum can maximize the performance of drying drum, increase its service life and reduce application cost. Let’s take a look at the actual operation steps below.
    1. Pay attention to routine inspections
    The asphalt mixing equipment drying drum has been tested and inspected before leaving the factory, but it will be subjected to vibration and vibration during transportation to the construction site. A comprehensive inspection should be carried out before use: check whether all anchor bolts are tightened; whether all key pins are properly driven; whether all drive devices are adjusted according to the manufacturer’s instructions; whether all pipe connections are appropriate and whether the three-way joints are reliable; whether the entire equipment is fully lubricated; start the motor and check whether all parts can rotate steadily in the correct rotation direction; whether the pressure gauge can work normally and whether the valve is adjusted to the correct working pressure; whether the burner ignition mechanism is available and whether the gate valve is open.
    2. Correct operation steps
    After the equipment is started, it is recommended to control the machine manually at the beginning, and then switch to the automatic control mode after achieving the required production volume and pouring temperature. The stone should be dried and have a stable moisture content as much as possible so that the stone can maintain a stable final temperature when passing through the drying drum. If the stones delivered to the drying drum change frequently and the moisture content changes each time, the burner should be adjusted frequently to compensate for these changes.
    The stones directly from the crushed stone have a relatively constant moisture content, while the stones from the outdoor storage yard have a higher moisture content, and the moisture content of different piles varies greatly. Therefore, it is best for the stones to come from the same source.

    Emulsified asphalt equipment plays an important role in road construction, and its production quality will directly affect the quality of facilities such as roads. In order to operate it better, we need to pay special attention to the following four points when applying emulsified asphalt equipment:
    1. Before spraying, the emulsified asphalt equipment must check whether the position of each valve is correct. The hot asphalt added to the emulsified asphalt equipment must reach an operating temperature of 160~180℃. For long-distance transportation or long working time, a heating device can be used for insulation, but it cannot be used as an oil melting furnace.
    2. When the asphalt in the emulsified asphalt equipment is heated by a burner, the asphalt height must exceed the upper plane of the combustion chamber, otherwise the combustion chamber will be burned.
    3. The emulsified asphalt equipment cannot be filled too full, and the fuel filler cap must be closed tightly to prevent asphalt from overflowing during transportation.
    4. This vehicle has two front and rear control consoles. When using the front control console, the switch must be turned to the front control. At this time, the rear control console can only control the lifting and lowering of the nozzle.
    I believe that through the above description, everyone will be more comfortable when using emulsified asphalt equipment in the future. As for the relevant operating matters of the equipment, I will introduce them to you here today. If you want to know more information, please pay attention to the next explanation.