Standardization construction technology and quality control of asphalt pavement in high temperature environment in summer
Summer is the golden window period for asphalt pavement construction, with sufficient daytime construction time and gentle mixture cooling rate, which is conducive to continuous paving of hot joints and effectively improving the integrity of pavement. However, with the continuous high temperature, strong light exposure, sudden rise of surface temperature and other conditions, asphalt mixture is easy to appear overheating softening, viscosity reduction, compaction window period shortened, oil separation, rutting and other quality problems, while high temperature operation also has greater safety hazards. If the normal temperature construction process is followed, it will easily cause early damage to the road surface, substandard flatness, and significant decline in durability. Combined with the characteristics of high temperature construction in summer, this paper combs standardized high temperature construction control skills from the whole process of construction difficulties, time planning, material mixing, transportation temperature control, paving and rolling, disease prevention and control, safety protection, etc., and provides practical reference for high quality and efficient construction of asphalt pavement in summer.
Find out more