How to keep the asphalt mixing station stable?
Products
Application
Case
Customer Support
Blog
Your Position: Home > Blog > Industry Blog
How to keep the asphalt mixing station stable?
Release Time:2024-08-06
Read:
Share:
First of all, the selection of the delivery pump in the asphalt mixing station must meet the requirements of the maximum asphalt pouring time, the highest height, and the maximum horizontal distance per unit time during construction. At the same time, there must be a certain technical and production capacity reserve, and the balanced production capacity is 1.2 to 1.5 times as the best. 
What you want to know about the daily maintenance of asphalt mixing plants_1What you want to know about the daily maintenance of asphalt mixing plants_2
Asphalt Mixing Station Price
 Secondly, the two major systems of the asphalt mixing station, the movement and hydraulics, must be normal, and there must be no abnormal sound and vibration, to avoid large aggregates and lumps inside the equipment, otherwise it is easy to get stuck at the feed port of the mixing station or blocked due to arching. Another point is that when the asphalt mixing station is in the same site, it is not appropriate to use too many pumps and pumps from multiple manufacturers to avoid affecting its normal operation.