The road surface paved with modified emulsified asphalt has good durability and wear resistance, does not soften at high temperatures, does not crack at low temperatures, has a high overload capacity, and multiplies the service life of the road surface.
Modified emulsified asphalt equipment is one of the equipment that is used for a long time in road construction projects. Before any equipment is put into use, it must be checked for basic installation. Check whether it is normal, and then put it into use. Here, Duxiu will introduce the inspection of modified emulsified asphalt equipment:

First, check the modified emulsifier of the modified emulsified asphalt equipment. If the gap of the emulsified asphalt colloid mill of the emulsifier used for a long time will become larger, then we need to adjust it at this time to continue production. This is a relatively simple problem.
Analyze the problem of modifiers. In general, the amount of modifiers added must be in place. When adding, the pH value must be adjusted according to the different water quality used. This problem requires professional personnel to analyze. Another possible reason is that the modified emulsified asphalt equipment itself has problems. Because ordinary asphalt also has different classifications, when producing modified asphalt, you must pay attention to whether the raw materials used are the required ordinary asphalt and ensure the quality.