What should be paid attention to when using asphalt? Let the asphalt mixing station introduce it!

1. Before the construction of asphalt, it is necessary to check the base condition first. If the base is uneven, it is necessary to flatten or fill the base first to ensure that the asphalt is evenly paved. In addition, before the asphalt is constructed, the base needs to be cleaned. If the conditions are relatively bad, it is recommended to rinse it with water to ensure the adhesion of the asphalt.
2. When constructing asphalt, a paver can be used, so that the construction effect will be better. When using a paver, it is necessary to preheat the equipment in advance to ensure that the temperature is above 100 degrees Celsius, and the asphalt and thickness must be calculated in advance, and the equipment must be adjusted to ensure that the thickness of the asphalt layer is uniform.
3. Asphalt needs to be heated while being constructed, so after the construction is completed, there is still a period of cooling period. Note that during this period, pedestrians cannot walk on it, let alone vehicles. According to professionals, when the asphalt temperature is below 50 degrees Celsius, it is generally possible to walk, but please note that heavier vehicles cannot walk.