Precautions for using emulsified bitumen equipment
Products
Application
Case
Customer Support
Blog
Your Position: Home > Blog > Industry Blog
Precautions for using emulsified bitumen equipment
Release Time:2025-04-30
Read:1020
Share:
Any equipment needs to understand the relevant operating matters before and after use, so that it can not only ensure the normal operation of the equipment, but also ensure the safety of construction operations. We all know that emulsified bitumen equipment plays an important role in road construction, and the quality of its production will directly affect the quality of facilities such as roads. In order to ensure its better operation, we need to pay special attention to four matters when using it.
Reasons why emulsified asphalt has sedimentation and oil slicks
When we use emulsified bitumen equipment, we need to pay special attention to the following four matters: 1. Before spraying, the equipment must check whether the position of each valve is correct. The hot bitumen added to the emulsified bitumen equipment must reach an operating temperature of 160~180℃. For long-distance transportation or long working time, a heating device can be used for insulation, but it cannot be used as a melting furnace. 2. When heating the asphalt in the emulsified bitumen equipment with a burner, the bitumen height must exceed the upper plane of the combustion chamber, otherwise the combustion chamber will be burned. 3. The equipment cannot be filled too full, and the refueling cap must be closed tightly to prevent bitumen from overflowing during transportation. 4. This vehicle has two control consoles, front and rear. When using the front control console, you need to turn the switch to the front control. At this time, the rear control console can only control the rise and fall of the nozzle.